The ICDP Lake Bosumtwi Drilling Project: A First Report
Summary The 10.5 -km-diameter, 1.07-Ma Bosumtwi impactcrater was the subject of a multi-disciplinary and internationaldrilling effort of the International ContinentalScientific Drilling Program (ICDP) from July to October2004.Sixteen different holes were drilled at six locationswithin the lake, to berness white sneakers alarecre.com a maximum depth